Allianso Development One - Chryso

Production unit - CHRYSO ROMANIA S.R.L.

1500 sqm

Objective:

"Construction of production and storage unit, administrative headquarters, road and pedestrian alleys, parking spaces, fencing, connections, utilities and site organization."

Prahova County, Aricestii Rahtivani Commune, Aricestii Rahtivani Village, PWP Ploiesti West Park Industrial Park,

Proposed built-up area on the ground = 1,501.53 sqm, including: production hall, administrative offices, fire extinguishing system (pump station and above-ground metal tank)

On an area of approximately 4,200 square meters, the construction works of road platforms and external storage, parking lots, sidewalks, green areas and vertical systematization will be carried out, on the area provided for by the project.

  • The resistance structure of the hall is made up of prefabricated reinforced concrete elements: prefabricated reinforced concrete pillars and main beams, prestressed concrete wedges and metal braces.
  • The closing of the hall is done with metal sandwich panels on the metal structure, sheet metal covering, wadding and membrane and carpentry. Partitioning and interior finishing works are carried out.
  • Interior electrical, sanitary, thermal, ventilation and fire extinguishing installations.
  • External water supply, rainwater and domestic sewerage, lighting, fire extinguishing networks.
Ness Proiect Europe

INDUSTRIAL

  Details
Ness Proiect Europe

INFRASTRUCTURE

  Details
Ness Proiect Europe

UTILITY NETWORKS

  Details
Ness Proiect Europe

GREEN ENERGY

  Details
Ness Proiect Europe

RESIDENTIAL

  Details