Concrete platform, high-traffic area of concrete and asphalt, parking and light traffic, structure, perimeter fences, roofs, sanitary installations, partitioning and interior finishing of offices, HVAC installations, interior electrical installations, fire detection and warning installations, fire alarm system fire extinguishing (interior and exterior hydrants), exterior electrical networks and TRAFO substations, exterior storm sewer networks, domestic sewerage, water supply network, fire house (pump house + above-ground fire tanks, above-ground concrete retention basin with a capacity of V=400 m³.
Overhead cranes (3 pieces) with a capacity of 5 tons each.
Green spaces.