150.000m³
Concrete platform, heavy traffic area, parking and light traffic road, docking area, bicycle track, resistance structure, claddings, roofs, partitions and interior finishes offices, sanitary installations, interior electrical installations, detection and warning installations at fire, fire extinguishing system (indoor hydrants and sprinklers), outdoor electrical networks and TRAFO stations, outdoor rainwater networks, domestic sewerage, water supply network, outdoor network of hydrants and sprinklers, fire management unit (pump house + above the ground water tanks, above the ground concrete retention tank with a capacity of V = 3100 m³).











